5 Ways Jet.Build Speeds Up Change Order Management

by Adam Stark

Change orders are a reality in construction—but they don’t have to mean delays, disputes, and added costs. Unfortunately, in many projects, change orders are still managed through outdated tools, manual workflows, or scattered communication channels. The result? Confusion, finger-pointing, and frustrated teams.

With Jet.Build, change orders are streamlined into one seamless process that ensures accountability, speed, and transparency.


Here are 5 ways Jet.Build accelerates change order management:

  1. Centralized Documentation 📂 – All change orders live in one place, accessible by both office and field teams.
  2. Real-Time Collaboration 🤝 – Approvals happen instantly, with visibility for every stakeholder.
  3. Ball-in-Court Accountability ✅ – Always know who’s responsible for the next step.
  4. Mobile Access 📲 – Review, approve, or reject change orders from the field—no delays waiting on office staff.
  5. Automated Audit Trails 🔍 – Every decision is tracked for accountability and future reference.

The Results:

Projects using Jet.Build report change order turnaround times up to 40% faster, reducing rework and keeping jobs on schedule.

👉 Change orders don’t have to mean chaos. With Jet.Build, they’re just another step in a smooth, accountable workflow.